| 115 Publications |
This is a list of publications by this researcher, listed chronologically starting with the most recent first. New publications appear in this list weekly. The source of publications and 'cited by' data for this application is Scopus.
Export
-
1.
2013Moacir Godinho Filho; Reha Uzsoy
International Journal of Production Research. 2013;51(2):447-464.0 -
2.
2012Necip Baris Kacar; Durmus Fatih Irdem; Reha Uzsoy
IEEE Transactions on Semiconductor Manufacturing. 2012;25(1):104-117.2 -
3.
2012Sukgon Kim; Reha Uzsoy
Modeling and analysis of integrated planning of production and engineering process improvement
ASMC (Advanced Semiconductor Manufacturing Conference) Proceedings. 2012:201-207.0 -
4.
2012Michael Hosking; Stephen Roberts; Reha Uzsoy; Talisa M. Joseph
Socio-Economic Planning Sciences. 2012.0 -
5.
2011Chen-Fu Chien; Stéphane Dauzère-Pérès; Hans Ehm; John W. Fowler; Zhibin Jiang; Shekar Krishnaswamy; Tae-Eog Lee; Lars Mönch; Reha Uzsoy
Modelling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes
European Journal of Industrial Engineering. 2011;5(3):254-271.2 -
6.
2011Kristy Crist; Reha Uzsoy
Prioritising production and engineering lots in wafer fabrication facilities: A simulation study
International Journal of Production Research. 2011;49(11):3105-3125.1 -
7.
2011Ali Kefeli; Reha Uzsoy; Yahya Fathi; Michael Kay
Using a mathematical programming model to examine the marginal price of capacitated resources
International Journal of Production Economics. 2011;131(1):383-391.3 -
8.
2011Moacir Godinho Filho; Reha Uzsoy
International Journal of Advanced Manufacturing Technology. 2011;52(5-8):669-681.3 -
9.
2011Jingang Liu; Chihui Li; Feng Yang; Hong Wan; Reha Uzsoy
Production planning for semiconductor manufacturing via simulation optimization
Proceedings - Winter Simulation Conference. 2011:3612-3622.0 -
10.
2010D. Fatih Irdem; Necip Baris Kacar; Reha Uzsoy
IEEE Transactions on Semiconductor Manufacturing. 2010;23(3):442-455.8 -
11.
2010Moacir Godinho Filho; Reha Uzsoy
Study of the effect of continuous improvement programs on lot size: Lead time relationship
Gestao e Producao. 2010;17(1):137-148.0 -
12.
2010Travis Worth; Reha Uzsoy; Erika Samoff; Anne-Marie Meyer; Jean-Marie Maillard; Aaron M. Wendelboe
Modelling the response of a public health department to infectious disease
Proceedings - Winter Simulation Conference. 2010:2185-2198.0 -
13.
2010N. Baris Kacar; Reha Uzsoy
Estimating clearing functions from simulation data
Proceedings - Winter Simulation Conference. 2010:1699-1710.0 -
14.
2009Seza Orcun; Reha Uzsoy; Karl G. Kempf
An integrated production planning model with load-dependent lead-times and safety stocks
Computers and Chemical Engineering. 2009;33(12):2159-2163.3 -
15.
2009Karthik Sourirajan; Leyla Ozsen; Reha Uzsoy
European Journal of Operational Research. 2009;197(2):599-608.22 -
16.
2009Sukgon Kim; Reha Uzsoy
Heuristics for capacity planning problems with congestion
Computers and Operations Research. 2009;36(6):1924-1934.3 -
17.
2009Jakob Asmundsson; Ronald L. Rardin; Can Hulusi Turkseven; Reha Uzsoy
Production planning with resources subject to congestion
Naval Research Logistics. 2009;56(2):142-157.16 -
18.
2009Moacir Godinho Filho; Reha Uzsoy
Producao. 2009;19(1):214-229.3 -
19.
2008A. Upasani; R. Uzsoy
International Journal of Production Research. 2008;46(21):5883-5905.9 -
20.
2008Karthik Sourirajan; Leyla Ozsen; Reha Uzsoy
IIE Transactions (Institute of Industrial Engineers). 2008;40(8):795-797.0 -
21.
2008Sukgon Kim; Reha M. Uzsoy
Integrated planning of production and engineering process improvement
IEEE Transactions on Semiconductor Manufacturing. 2008;21(3):390-398.2 -
22.
2008Abhijit Upasani; Reha Uzsoy
Annals of Operations Research. 2008;161(1):171-188.9 -
23.
2008Reha Uzsoy; Juan Diego Velásquez
Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times
Computers and Operations Research. 2008;35(6):2018-2033.9 -
24.
2008Christopher D. Geiger; Reha Uzsoy
Learning effective dispatching rules for batch processor scheduling
International Journal of Production Research. 2008;46(6):1431-1454.15 -
25.
2008Sukgon Kim; Reha Uzsoy
Exact and heuristic procedures for capacity expansion problems with congestion
IIE Transactions (Institute of Industrial Engineers). 2008;40(12):1185-1197.3 -
26.
2008Moacir Godinho Filho; Reha Uzsoy; Edward P. Fitts
IIE Annual Conference and Expo 2008. 2008:463-468.0 -
27.
2008Chen-Fu Chien; Stéphane Dauzère-Pérès; Hans Ehm; John W. Fowler; Zhibin Jiang; Shekar Krishnaswamy; Lars Mönch; Reha Uzsoy
Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes
Proceedings - Winter Simulation Conference. 2008:2093-2099.4 -
28.
2008Durmus Fatih Irdem; Necip Baris Kacar; Reha Uzsoy
An experimental study of an iterative simulation-optimization algorithm for production planning
Proceedings - Winter Simulation Conference. 2008:2176-2184.2 -
29.
2007Vishal A. Varma; Reha Uzsoy; Joseph Pekny; Gary Blau
Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry
Journal of Heuristics. 2007;13(5):403-433.3 -
30.
2007Sujay Malve; Reha Uzsoy
Computers and Operations Research. 2007;34(10):3016-3028.44 -
31.
2007S. Orcun; J.M. Asmundsson; R. Uzsoy; J.P. Clement; J.F. Pekny; R.L. Rardin
Production Planning and Control. 2007;18(5):388-406.2 -
32.
2007Karthik Sourirajan; Leyla Ozsen; Reha Uzsoy
A single-product network design model with lead time and safety stock considerations
IIE Transactions (Institute of Industrial Engineers). 2007;39(5):411-424.22 -
33.
2007Erdem Eskigun; Reha Uzsoy; Paul V. Preckel; George Beaujon; Subramanian Krishnan; Jeffrey D. Tew
Outbound supply chain network design with mode selection and lead time considerations
Naval Research Logistics. 2007;54(3):282-300.5 -
34.
2007Karthik Sourirajan; Reha Uzsoy
Journal of Scheduling. 2007;10(1):41-65.26 -
35.
2007Seza Orcun; Sila Çetinkaya; Reha Uzsoy
Determining safety stocks in the presence of workload-dependent lead times
Proceedings - Winter Simulation Conference. 2007:1691-1698.0 -
36.
2006Abhijit A. Upasani; Reha Uzsoy; Karthik Sourirajan
A problem reduction approach for scheduling semiconductor wafer fabrication facilities
IEEE Transactions on Semiconductor Manufacturing. 2006;19(2):216-225.15 -
37.
2006Jakob Asmundsson; Ronald L. Rardin; Reha Uzsoy
Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
IEEE Transactions on Semiconductor Manufacturing. 2006;19(1):95-111.39 -
38.
2006Christopher D. Geiger; Reha Uzsoy; Haldun Aytuǧ
Rapid modeling and discovery of priority dispatching rules: An autonomous learning approach
Journal of Scheduling. 2006;9(1):7-34.31 -
39.
2006Seza Orcun; Reha Uzsoy; Karl Kempf
Using system dynamics simulations to compare capacity models for production planning
Proceedings - Winter Simulation Conference. 2006:1855-1862.3 -
40.
2005Elif Akçali; Alper Üngör; Reha Uzsoy
Short-term capacity allocation problem with tool and setup constraints
Naval Research Logistics. 2005;52(8):754-764.9 -
41.
2005Erdem Eskigun; Reha Uzsoy; Paul V. Preckel; George Beaujon; Subramanian Krishnan; Jeffrey D. Tew
European Journal of Operational Research. 2005;165(1):182-206.44 -
42.
2005Haldun Aytug; Mark A. Lawley; Kenneth McKay; Shantha Mohan; Reha Uzsoy
Executing production schedules in the face of uncertainties: A review and some future directions
European Journal of Operational Research. 2005;161(1):86-110.178 -
43.
2005A. Barua; N. Raghavan; A. Upasani; R. Uzsoy
Implementing global factory schedules in the face of stochastic disruptions
International Journal of Production Research. 2005;43(4):793-818.17 -
44.
2003H. Aytug; K. Kempf; R. Uzsoy
Measures of subproblem criticality in decomposition algorithms for shop scheduling
International Journal of Production Research. 2003;41(5):865-882.15 -
45.
2003H. Aytug; A. Barua; M. Lawley; R. Uzsoy
International Journal of Production Research. 2003;41(1):81-95.4 -
46.
2002Cheng-Shuo Wang; Reha Uzsoy
A genetic algorithm to minimize maximum lateness on a batch processing machine
Computers and Operations Research. 2002;29(12):1621-1640.72 -
47.
2001Ronald L. Rardin; Reha Uzsoy
Experimental evaluation of heuristic optimization algorithms: A tutorial
Journal of Heuristics. 2001;7(3):261-304.89 -
48.
2001K. Horiguchi; N. Raghavan; R. Uzsoy; S. Venkateswaran
Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility
International Journal of Production Research. 2001;39(5):825-842.21 -
49.
2001Elif Akçall; Martin Davis; Randall D. Hamlin; Thomas McCullough; Timothy Teyner; Reha Uzsoy
A decision support system for spare parts management in a wafer fabrication facility
IEEE Transactions on Semiconductor Manufacturing. 2001;14(1):76-78.8 -
50.
2001Elif Akçah; Kazunori Nemoto; Reha Uzsoy
Cycle-time improvements for photolithography process in semiconductor manufacturing
IEEE Transactions on Semiconductor Manufacturing. 2001;14(1):48-56.56 -
51.
2000Irfan M. Ovacik; Srikanth Rajagopalan; Reha Uzsoy
Journal of Heuristics. 2000;6(4):481-500.10 -
52.
2000Karl Kempf; Reha Uzsoy; Stephen Smith; Kevin Gary
Evaluation and comparison of production schedules
Computers in Industry. 2000;42(2):203-220.28 -
53.
2000Reha Uzsoy; Cheng-Shuo Wang
Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
International Journal of Production Research. 2000;38(6):1271-1286.35 -
54.
2000Elif Akcali; Reha Uzsoy; David G. Hiscock; Anne L. Moser; Timothy J. Teyner
Winter Simulation Conference Proceedings. 2000;2:1428-1435.8 -
55.
2000E. Akçali; R. Uzsoy
Proceedings of the IEEE/CPMT International Electronics Manufacturing Technology (IEMT) Symposium. 2000:374-381.8 -
56.
2000Kazunori Nemoto; Elif Akcali; Reha M. Uzsoy
Quantifying the benefits of cycle time reduction in semiconductor wafer fabrication
IEEE Transactions on Electronics Packaging Manufacturing. 2000;23(1):39-47.11 -
57.
2000Ebru Demirkol; Reha Uzsoy
Decomposition methods for reentrant flow shops with sequence-dependent setup times
Journal of Scheduling. 2000;3(3):155-177.41 -
58.
2000Kazunori Nemoto; Elif Akcali; Reha Uzsoy
Quantifying the benefits of cycle time reduction in semiconductor wafer fabrication
IEEE Transactions on Electronics Packaging Manufacturing. 2000;23(1):3.3 -
59.
1999Miae Woo; Reha Uzsoy; Arif Ghafoor
Media Streams Scheduling for Synchronization in Distributed Multimedia Systems
Journal of Parallel and Distributed Computing. 1999;56(3):272-295.3 -
60.
1999Sanjay V. Mehta; Reha Uzsoy
Predictable scheduling of a single machine subject to breakdowns
International Journal of Computer Integrated Manufacturing. 1999;12(1):15-38.51 -
61.
1999Anu Meacham; Reha Uzsoy; Uday Venkatadri
Optimal disassembly configurations for single and multiple products
Journal of Manufacturing Systems. 1999;18(5):311-322.28 -
62.
1999C.-Y. Lee; R. Uzsoy
Minimizing makespan on a single batch processing machine with dynamic job arrivals
International Journal of Production Research. 1999;37(1):219-236.94 -
63.
1999Ronan O'Donovan; Reha Uzsoy; Kenneth N. McKay
Predictable scheduling of a single machine with breakdowns and sensitive jobs
International Journal of Production Research. 1999;37(18):4217-4233.63 -
64.
1998Ebru Demirkol; Sanjay Mehta; Reha Uzsoy
Benchmarks for shop scheduling problems
European Journal of Operational Research. 1998;109(1):137-141.72 -
65.
1998L. Beril Toktay; Reha Uzsoy
A capacity allocation problem with integer side constraints
European Journal of Operational Research. 1998;109(1):170-182.31 -
66.
1998Karl G. Kempf; Reha Uzsoy; Cheng-Shuo Wang
Scheduling a Single Batch Processing Machine with Secondary Resource Constraints
Journal of Manufacturing Systems. 1998;17(1):37-51.26 -
67.
1998Sanjay V. Mehta; Reha Uzsoy
Minimizing total tardiness on a batch processing machine with incompatible job families
IIE Transactions (Institute of Industrial Engineers). 1998;30(2):165-178.87 -
68.
1998Sarah A. Mosley; Tim Teyner; Rena M. Uzsoy
Maintenance scheduling and staffing policies in a wafer fabrication facility
IEEE Transactions on Semiconductor Manufacturing. 1998;11(2):316-323.25 -
69.
1998Sanjay V. Mehta; Reha M. Uzsoy
Predictable scheduling of a job shop subject to breakdowns
IEEE Transactions on Robotics and Automation. 1998;14(3):365-378.92 -
70.
1998A.N. Avramidis; K.J. Healy; R. Uzsoy
Control of a batch-processing machine: A computational approach
International Journal of Production Research. 1998;36(11):3167-3181.21 -
71.
1997David Kayton; Tim Teyner; Christopher Schwartz; Reha Uzsoy
Production and Inventory Management Journal. 1997;38(4):51-57.15 -
72.
1997Ebru Demirkol; Reha Uzsoy
Performance of decomposition methods for complex workshops under multiple criteria
Computers and Industrial Engineering. 1997;33(1-2):261-264.3 -
73.
1997Christopher D. Geiger; Rieko Hase; Christos G. Takoudis; Reha Uzsoy
Alternative facility layouts for semiconductor wafer fabrication facilities
IEEE transactions on components, packaging and manufacturing technology. Part C. Manufacturing. 1997;20(2):152-163.12 -
74.
1997Reha Uzsoy; Yaoyu Yang
Minimizing total weighted completion time on a single batch processing machine
Production and Operations Management. 1997;6(1):57-73.42 -
75.
1997Christopher D. Geiger; Karl G. Kempf; Reha Uzsoy
A Tabu Search Approach to Scheduling an Automated Wet Etch Station
Journal of Manufacturing Systems. 1997;16(2):102-116.29 -
76.
1997Reha Uzsoy; Cheng-Shuo Wang
Decomposition procedures for global scheduling of complex job shops
Proceedings of the IEEE/CPMT International Electronics Manufacturing Technology (IEMT) Symposium. 1997:425-429.1 -
77.
1997Elif Akcali; Randall D. Hamlin; Tim Teyner; Reha Uzsoy; Geetha Venkatachalam
Spare parts inventory management for semiconductor wafer fabrication facilities
IEEE International Symposium on Semiconductor Manufacturing Conference, Proceedings. 1997:A17-A20.2 -
78.
1997Chung-Yee Lee; Reha Uzsoy; Louis A. Martin-Vega
Addendum to `efficient algorithms for scheduling semiconductor burn-in operations'
Operations Research. 1997;45(1):153-154.0 -
79.
1997Reha Uzsoy
Production planning for companies with product recovery and remanufacturing capability
IEEE International Symposium on Electronics & the Environment. 1997:285-290.6 -
80.
1997Suresh Chand; Rodney Traub; Reha Uzsoy
Annals of Operations Research. 1997;70:115-125.32 -
81.
1997Ali Tamer Unal; Reha Uzsoy; Ali S. Kiran
Rescheduling on a single machine with part-type dependent setup times and deadlines
Annals of Operations Research. 1997;70:93-113.43 -
82.
1997Ebru Demirkol; Sanjay Mehta; Reha Uzsoy
A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems
Journal of Heuristics. 1997;3(2):111-137.46 -
83.
1996Suresh Chand; Rodney Traub; Reha Uzsoy
Single-machine scheduling with dynamic arrivals: Decomposition results and an improved algorithm
Naval Research Logistics. 1996;43(5):709-719.19 -
84.
1996Suresh Chand; Rodney Traub; Reha Uzsoy
An iterative heuristic for the single machine dynamic total completion time scheduling problem
Computers and Operations Research. 1996;23(7):641-651.12 -
85.
1996Harry H. Holtsclaw; Reha Uzsoy
Journal of the Operational Research Society. 1996;47(5):666-677.24 -
86.
1996Irfan M. Ovacik; Reha Uzsoy
Decomposition methods for scheduling semiconductor testing facilities
International Journal of Flexible Manufacturing Systems. 1996;8(4):357-388.18 -
87.
1996Kazunori Nemoto; Elif Akcali; Reha Uzsoy
Quantifying the benefits of cycle time reduction in semiconductor wafer fabrication
Proceedings of the IEEE/CPMT International Electronic Manufacturing Technology (IEMT) Symposium. 1996:130-136.0 -
88.
1996Shannon Chen; Christos Takoudis; Reha Uzsoy
Proceedings of the IEEE/CPMT International Electronic Manufacturing Technology (IEMT) Symposium. 1996:212-217.0 -
89.
1996David Kayton; Tim Teyner; Christopher Schwartz; Reha Uzsoy
Proceedings of the IEEE/CPMT International Electronic Manufacturing Technology (IEMT) Symposium. 1996:49-56.5 -
90.
1995I.M. Ovacik; R. Uzsoy
International Journal of Production Research. 1995;33(11):3173-3192.82 -
91.
1995R. Uzsoy
Scheduling batch processing machines with incompatible job families
International Journal of Production Research. 1995;33(10):2685-2708.116 -
92.
1995Allen J. Clegg; David J. Williams; Reha Uzsoy
Production planning for companies with remanufacturing capability
IEEE International Symposium on Electronics & the Environment. 1995:186-191.29 -
93.
1995Irfan M. Ovacik; Reha Uzsoy
Decomposition methods for scheduling large complex shops
Industrial Engineering Research - Conference Proceedings. 1995:120-127.0 -
94.
1995Sanjay V. Mehta; Reha Uzsoy
Predictable scheduling: An approach to reducing the effects of uncertainties on production schedules
Industrial Engineering Research - Conference Proceedings. 1995:914-918.0 -
95.
1995Ebru Demirkol; Reha Uzsoy; Irfan M. Ovacik
Decomposition algorithms for scheduling semiconductor testing facilities
Proceedings of the IEEE/CPMT International Electronic Manufacturing Technology (IEMT) Symposium. 1995:199-204.3 -
96.
1995Shannon Chen; Rieko C. Hase; Kaine Mordaunt; Reha M. Uzsoy; Christos G. Takoudis
Proceedings of SPIE - The International Society for Optical Engineering. 1995;2637:168-178.0 -
97.
1995Rieko Hase; Reha Uzsoy; Christos G. Takoudis
Alternative facility layouts for semiconductor wafer fabrication facilities
Proceedings of the IEEE/CPMT International Electronic Manufacturing Technology (IEMT) Symposium. 1995:384-388.0 -
98.
1995James R. Ashby; Reha Uzsoy
Scheduling and order release in a single-stage production system
Journal of Manufacturing Systems. 1995;14(4):290-306.16 -
99.
1994Gündüz Ulusoy; Reha Uzsoy
A robust strategy approach to a strategic mobility problem
European Journal of Operational Research. 1994;79(2):266-276.1 -
100.
1994Reha Uzsoy; Chung-Yee Lee; Louis A. Martin-Vega
IIE Transactions (Institute of Industrial Engineers). 1994;26(5):44-55.196 -
101.
1994R. Uzsoy
Scheduling a single batch processing machine with non-identical job sizes
International Journal of Production Research. 1994;32(7):1615-1635.146 -
102.
1994I.M. Ovacik; R. Uzsoy
International Journal of Production Research. 1994;32(6):1243-1263.91 -
103.
1994Irfan M. Ovacik; Reha Uzsoy
Exploiting shop floor status information to schedule complex job shops
Journal of Manufacturing Systems. 1994;13(2):73-84.45 -
104.
1994Rieko Hase; Christos G. Takoudis; Reha Uzsoy
Cellular and reentrant layouts for semiconductor wafer fabrication facilities
Proceedings of the IEEE/CPMT International Electronics Manufacturing Technology (IEMT) Symposium. 1994;1:112-118.2 -
105.
1993V. Chandru; C.-Y. Lee; R. Uzsoy
Minimizing total completion time on batch processing machines
International Journal of Production Research. 1993;31(9):2097-2121.131 -
106.
1993Vijaya Chandru; Chung-Yee Lee; Reha Uzsoy
Minimizing total completion time on a batch processing machine with job families
Operations Research Letters. 1993;13(2):61-65.91 -
107.
1993Craig N. Perry; Reha Uzsoy
Reactive scheduling of a semiconductor testing facility
IEEE/CHMT European International Electronic Manufacturing Technology Symposium. 1993:191-194.5 -
108.
1993Irfan M. Ovacik; Reha Uzsoy
Exploiting real-time shop floor status information to schedule complex job shops
Proceedings of the Industrial Engineering Research Conference. 1993:868-872.1 -
109.
1992Chung-Yee Lee; Reha Uzsoy; Louis A. Martin-Vega
Efficient algorithms for scheduling semiconductor burn-in operations
Operations Research. 1992;40(4):764-775.206 -
110.
1992Reha Uzsoy; Chung-Yee Lee; Louis A. Martin-Vega
Naval Research Logistics. 1992;39(3):369-388.43 -
111.
1992Chung-Yee Lee; Reha Uzsoy
A new dynamic programming algorithm for the parallel machines total weighted completion time problem
Operations Research Letters. 1992;11(2):73-75.15 -
112.
1991Reha Uzsoy; Louis A. Martin-Vega; Chung-Yee Lee; Paul A. Leonard
Production scheduling algorithms for a semiconductor test facility
IEEE Transactions on Semiconductor Manufacturing. 1991;4(4):270-280.66 -
113.
1991Reha Uzsoy; David J. Ramcharan; Louis A. Martin-Vega
An experimental expert system for process planning of sheet-metal parts
Computers and Industrial Engineering. 1991;20(1):59-69.5 -
114.
1990Reha Uzsoy; Louis A. Martin-Vega
Modelling kanbanbased demand-pull systems. A survey and critique
Manufacturing review. 1990;3(3):155-160.22 -
115.
1989Reha Uzsoy; Louis A. Martin-Vega; Steven M. Brown; Paul A. Leonard
Production scheduling algorithms for a semiconductor test facility
1989:25-31.0
